L1 / Physical Infrastructure

Provisioning Pipeline

9-step operator-driven flow: buy DID → spin emulator → connect ADB → install WA → register → OTP → pair to Green API → place in cluster → ready.

Phase 1 (port AMP VccProvisioningOrchestrator state machine)
Once Built, This Page Will Show
  • Live job queue with per-step status (buy_did → READY)
  • Operator paste-input for MLI ADB connect command + glogin password
  • Per-step elapsed time + retry button
  • Failure mode dispatcher: stuck on register → suggest IP rotation, stuck on OTP → suggest 5sim refresh
Backend Endpoints (When Built)
POST /v1/provisioning/jobs { region, hostKind, didProvider }GET /v1/provisioning/jobsPOST /v1/provisioning/jobs/:id/steps/:step/runPOST /v1/provisioning/jobs/:id/steps/connect-adb { adbCommand, gloginCommand }